United States Department of Agriculture
Natural Resources Conservation Service
South Carolina Go to Accessibility Information
Skip to Page Content





South Carolina EQIP Cost List for FY 2003  

Practice# Practice Name Units Unit Cost Cost Share Program Points Years
192-H Incinerator-High Each $5,000 50% 15 -
192-L Incinerator-Low Each $3,700 50% 15 -
193 Treatment of Poultry Litter with Alum 2-3 Ton/Yr/20,000SqFT House Each $500 Incentive 15 1,2,3
193-H Treatment of Poultry Litter with Alum 4-5 Ton/Yr/20,000SqFt House Each $900 Incentive 15 1,2,3
313 Waste Storage System Each $0 NA 20 1
313-1 Waste Storage Facility-with Roof SqFt $9 50% 0 -
313-11 Waste Storage Facility-without Roof SqFt $5 50% 0 -
313-2 Waste Storage Facility-Holding Pond CuFt $0.20 50% 0 -
313-3 Waste Storage Facility-Liner, Flexible Membrane SqFt $0.60 50% 0 -
313-4 Waste Storage Facility-Liner, Compacted Clay CuYd $7.50 50% 0 -
313-5 Waste Storage Facility-Liner, Bentonite Treatment Ton $230 50% 0 -
317 Composting Facility SqFt $12 50% 20 -
327-H Conservation Cover-342 Acre $450 50% 5 -
327-L Conservation Cover-647 Acre $25 50% 5 -
327-M Conservation Cover-512 Acre $250 50% 5 -
329A Residue Management (3-Yrs) Acre $30 Incentive 15 3
332 Contour Buffer Strips Acre $7 Incentive 10 1
338 Prescribed Burning (Includes Standby) Acre $20 50% 5 -
340 Cover Crop-No-Til for 329A Acre $12 Incentive 10 1,2,3
342 Critical Area Planting Acre $490 50% 15 -
350 Sediment Basin CuYd $3 50% 15 -
351 Well Decommissionng Ft $10 50% 10 -
360 Closure of Waste Impoundment-Gun System CuYd $2.30 50% 10 -
Practice# Practice Name Units Unit Cost Cost Share Program Points Years
             
360-1 Closure of Waste Impountment-Truck Mounted CuYd $6.10 50% 10 -
362 Diversion LnFt $0.75 50% 15 -
378 Pond (Livestock Water) CuYd $3 50% 5 -
382 Fence LnFt $1.75 50% 10 -
386-H Field Border-342 Acre $490 50% 15 -
386-L Field Border-Native Vegetation (647) Acre $25 50% 15 -
386-M Field Border-512 Acre $250 50% 15 -
391A Riparian Forest Buffer Acre $200 50% 20 -
393-H Filter Strip-342 Acre $490 50% 15 -
393-L Filter Strip-647 Acre $25 50% 15 -
393-M Filter Strip-512 Acre $250 50% 15 -
394 Firebreak Ln Ft $0.15 50% 5 -
410 Grade Stabilization Structure CuYd $3 50% 10 -
410-R Grade Stabilization Structure-Rock Chute Ton $50 50% 10 -
412H Grassed Waterway-High Acre $2,000 50% 15 -
412L Grassed Waterway-Low Acre $1,000 50% 15 -
441-1 Irrigation Conversion - Sprinkler to Micro (Orchards) Acre $800 50% 5 -
441-2 Irrigation Conversion - Sprinkler to Micro (Temp. Tape) Acre $450 50% 5 -
441-3 Irrigation Conversion - Sprinkler to Micro (Subsurface) Acre $900 50% 5 -
442-1 Irrigation Conversion - Sprinkler to LPIC Foot $5.80 50% 5 -
442-2 Irrigation Conversion - Sprinkler to LEPA Foot $9.80 50% 5 -
442-3 Irrigation Conversion - Sprinkler to MESA Foot $5.60 50% 5 -
460-H Land Clearing-High Acre $900 50% 5 -
460-L Land Clearing-Low Acre $450 50% 5 -
484 Mulching Ton $250 50% 15 -
512-H Introduced Pasture and Hay Planting-High Acre $250 50% 10 -
512-L Introduced Pasture and Hayland Planting-Low Acre $175 50% 10 -
             
Practice# Practice Name Units Unit Cost Cost Share Program Points Years
             
512-N Native Pasture Planting Acre $300 50% 15 -
516 Pipeline LnFt $1.35 50% 10 -
528A Prescribed Grazing-High Acre $25 Incentive 15 1,2,3
528B Prescribed Grazing-Low Acre $15 Incentive 15 1,2,3
548 Grazing Land Mechanical Treatment Acre $12.50 50% 5 -
561H Heavy Use Area SqFt $2.25 50% 15 -
561L Heavy Use Area SqFt $1.25 50% 15 -
574 Spring Development Each $925 50% 15 -
580 Streambank & Shoreline Protection-Bio/Eng LnFt $28 50% 20 -
580-B Streambank and Shoreline Protection-Bio Methods LnFt $21 50% 20 -
580-E Streambank and Shoreline Protection-Hard Engineering Ton $34 50% 20 -
585 Contour Strip Cropping Acre $7 Incentive 10 1
586 Field Stripcropping Acre $7 Incentive 10 1
587 Water Control Structure System Each $0 NA 10 -
587-1 Structure for Water Control <12" Pipe Each $1,980 50% 0 -
587-10 Corrugated PE Pipe 36" LnFt $41 50% 0 -
587-2 Structure for Water Control-12"-15" Pipe Each $2,450 50% 0 -
587-3 Structure for Water Control-18"-24" Pipe Each $3,370 50% 0 -
587-4 Structure for Water Control-30"-36" Pipe Each $5,320 50% 0 -
587-5 Corrugated PE Pipe 12" LnFt $7 50% 0 -
587-6 Corrugated PE Pipe 15" LnFt $10 50% 0 -
587-7 Corrugated PE Pipe 18" LnFt $15 50% 0 -
587-8 Corrugated PE Pipe 24" LnFt $21 50% 0 -
587-9 Corrugated PE Pipe 30" LnFt $33 50% 0 -
590 Nutrient Management Acre $5 Incentive 10 1,2,3
             
Practice# Practice Name Units Unit Cost Cost Share Program Points Years
             
595 Pest Management Acre $5 Incentive 10 1,2,3
600 Terrace LnFt $0.50 50% 10 -
612 Tree /Shrub Establishment Acre $67.50 50% 10 -
614-H Water Tank-High Each $280 50% 10 -
614-L Water Tank-Low Each $140 50% 10 -
633-L Waste Utilization-Liquids KCuFt/Yr $92 Incentive 15 1
633-S Waste Utilization-Solid Waste Tons/Yr $6.25 Incentive 15 1
634 Manure Transfer System Each $0 NA 15 1
634-1 Manure Transfer-4"Pipe LnFt $5 50% 0 -
634-2 Manure Transfer-6"Pipe LnFt $9 50% 0 -
634-3 Manure Transfer-8"Pipe LnFt $12 50% 0 -
634-4 Manure Transfer-Pump + Accessories Each $5,000 50% 0 -
638 Water/Sediment Control Basin CuYd $3 50% 15 -
642 Well LnFt $14 50% 10 -
645 Wildlife Upland Habitat Acre $300 50% 15 -
647 Early Secessional Habitat Mgt Acre $25 50% 15 -
655 Forest Trails and Landings (Waterbars) Each $21 50% 15 -

Contact

Bethel DuRant
Phone: 803-253-3512
Email: bethel.durant@sc.usda.gov

< Back to SC EQIP Homepage