| Practice#
| Practice Name
| Units
| Unit Cost
| Cost Share
| Program Points
| Years
|
| 769 |
Incinerator-High |
Each |
$5,000 |
50% |
15 |
- |
| 769 |
Incinerator-Low |
Each |
$3,700 |
50% |
15 |
- |
| 786 |
Treatment of Poultry Litter with Alum 2-3 Ton/Yr/20,000SqFT House |
Each |
$500 |
Incentive |
15 |
1,2,3 |
| 786 |
Treatment of Poultry Litter with Alum 4-5 Ton/Yr/20,000SqFt House |
Each |
$900 |
Incentive |
15 |
1,2,3 |
| 313 |
Waste Storage System |
Each |
$0 |
NA |
20 |
1 |
| 313-1 |
Waste Storage Facility-with Roof |
SqFt |
$9 |
50% |
0 |
- |
| 313-11 |
Waste Storage Facility-without Roof |
SqFt |
$5 |
50% |
0 |
- |
| 313-2 |
Waste Storage Facility-Holding Pond |
CuFt |
$0.20 |
50% |
0 |
- |
| 313-3 |
Waste Storage Facility-Liner, Flexible Membrane |
SqFt |
$0.60 |
50% |
0 |
- |
| 313-4 |
Waste Storage Facility-Liner, Compacted Clay |
CuYd |
$7.50 |
50% |
0 |
- |
| 313-5 |
Waste Storage Facility-Liner, Bentonite Treatment |
Ton |
$250 |
50% |
0 |
- |
| 317 |
Composting Facility |
SqFt |
$12 |
50% |
20 |
- |
| 327-H |
Conservation Cover-342 |
Acre |
$250 |
50% |
5 |
- |
| 327-L |
Conservation Cover-647 |
Acre |
$30 |
50% |
5 |
- |
| 327-M |
Conservation Cover-512 |
Acre |
$175 |
50% |
5 |
- |
| 338 |
Prescribed Burning (Includes Standby) |
Acre |
$20 |
50% |
5 |
- |
| 340 |
Cover Crop |
Acre |
$12 |
Incentive |
10 |
1,2,3 |
| 342 |
Critical Area Planting |
Acre |
$350 |
50% |
15 |
- |
| 350 |
Sediment Basin |
CuYd |
$3 |
50% |
15 |
- |
| 351 |
Well Decommissionng |
Ft |
$10 |
50% |
10 |
- |
| 360 |
Closure of Waste Impoundment-Gun System |
CuYd |
$2.30 |
50% |
10 |
- |
|
|
|
|
|
|
|
| Practice# |
Practice Name |
Units |
Unit Cost |
Cost Share |
Program Points |
Years |
| |
|
|
|
|
|
|
| 360-1 |
Closure of Waste Impountment-Truck Mounted |
CuYd |
$6.10 |
50% |
10 |
- |
| 362 |
Diversion |
LnFt |
$0.75 |
50% |
15 |
- |
| 378 |
Pond (Livestock Water) |
CuYd |
$3 |
50% |
5 |
- |
| 382 |
Fence |
LnFt |
$1.50 |
50% |
10 |
- |
| 386-H |
Field Border-342 |
LnFt |
$0.02 |
50% |
15 |
- |
| 386-L |
Field Border-Native Vegetation (647) |
LnFt |
$0.115 |
50% |
15 |
- |
| 386-M |
Field Border-512 |
Acre |
$250 |
50% |
15 |
- |
| 393-H |
Filter Strip-342 |
Acre |
$250 |
50% |
15 |
- |
| 393-L |
Filter Strip-647 |
Acre |
$30 |
50% |
15 |
- |
| 393-M |
Filter Strip-512 |
Acre |
$175 |
50% |
15 |
- |
| 394 |
Firebreak |
Ln Ft |
$0.15 |
50% |
5 |
- |
| 410 |
Grade Stabilization Structure |
CuYd |
$3 |
50% |
10 |
- |
| 410-R |
Grade Stabilization Structure-Rock Chute |
Ton |
$50 |
50% |
10 |
- |
| 412H |
Grassed Waterway-High |
Acre |
$2,000 |
50% |
15 |
- |
| 412L |
Grassed Waterway-Low |
Acre |
$1,000 |
50% |
15 |
- |
| 441-1 |
Irrigation Conversion - Sprinkler to Micro (Orchards) |
Acre |
$800 |
50% |
5 |
- |
| 442-1 |
Irrigation Conversion - Sprinkler to LPIC |
Foot |
$5.80 |
50% |
5 |
- |
| 442-2 |
Irrigation Conversion - Sprinkler to LEPA |
Foot |
$9.80 |
50% |
5 |
- |
| 442-3 |
Irrigation Conversion - Sprinkler to MESA |
Foot |
$5.60 |
50% |
5 |
- |
| 460-H |
Land Clearing-High |
Acre |
$900 |
50% |
5 |
- |
| 460-L |
Land Clearing-Low |
Acre |
$450 |
50% |
5 |
- |
| 466 |
Land Smoothing |
Acre |
$300 |
50% |
|
|
| 484 |
Mulching |
Ton |
$250 |
50% |
15 |
- |
| 484 |
Mulch-Blanked |
SqYd |
$2.25 |
50% |
|
|
| 512-H |
Introduced Pasture and Hay Planting-High |
Acre |
$250 |
50% |
10 |
- |
| 512-L |
Introduced Pasture and Hayland Planting-Low |
Acre |
$175 |
50% |
10 |
- |
| |
|
|
|
|
|
|
| Practice# |
Practice Name |
Units |
Unit Cost |
Cost Share |
Program Points |
Years |
| |
|
|
|
|
|
|
| 512-N(H) |
Native Pasture Planting |
Acre |
$250 |
50% |
15 |
- |
| 512-N(L) |
Native Pasture Planting |
Acre |
$175 |
50% |
15 |
- |
| 516 |
Pipeline |
LnFt |
$1.45 |
50% |
10 |
- |
| 528A |
Prescribed Grazing-High |
Acre |
$25 |
Incentive |
15 |
1,2,3 |
| 528B |
Prescribed Grazing-Low |
Acre |
$10 |
Incentive |
15 |
1,2,3 |
| 548 |
Grazing Land Mechanical Treatment |
Acre |
$12.50 |
50% |
5 |
- |
| 561H |
Heavy Use Area |
SqFt |
$2.25 |
50% |
15 |
- |
| 561L |
Heavy Use Area |
SqFt |
$1.25 |
50% |
15 |
- |
| 574 |
Spring Development |
Each |
$925 |
50% |
15 |
- |
| 580 |
Streambank and Shoreline Protection-Hard Engineering |
Ton |
$50 |
50% |
20 |
- |
| 585 |
Contour Strip Cropping |
Acre |
$7 |
Incentive |
10 |
1 |
| 586 |
Field Stripcropping |
Acre |
$7 |
Incentive |
10 |
1 |
| 587 |
Water Control Structure System |
Each |
$0 |
NA |
10 |
- |
| 587-1 |
Structure for Water Control <12" Pipe |
Each |
$1,980 |
50% |
0 |
- |
| 587 |
Structure for Water Control <8" Pipe |
Each |
$1,260 |
50% |
0 |
- |
| 587-2 |
Structure for Water Control-12"-15" Pipe |
Each |
$2,450 |
50% |
0 |
- |
| 587-3 |
Structure for Water Control-18"-24" Pipe |
Each |
$3,370 |
50% |
0 |
- |
| 587-4 |
Structure for Water Control-30"-36" Pipe |
Each |
$5,320 |
50% |
0 |
- |
| 587-5 |
Corrugated PE Pipe 12" |
LnFt |
$7 |
50% |
0 |
- |
| 587-6 |
Corrugated PE Pipe 15" |
LnFt |
$10 |
50% |
0 |
- |
| 587-7 |
Corrugated PE Pipe 18" |
LnFt |
$15 |
50% |
0 |
- |
| 587-8 |
Corrugated PE Pipe 24" |
LnFt |
$21 |
50% |
0 |
- |
| 587-9 |
Corrugated PE Pipe 30" |
LnFt |
$33 |
50% |
0 |
- |
| 590 |
Nutrient Management |
Acre |
$5 |
Incentive |
10 |
1,2,3 |
| |
|
|
|
|
|
|
| Practice# |
Practice Name |
Units |
Unit Cost |
Cost Share |
Program Points |
Years |
| |
|
|
|
|
|
|
| 600 |
Terrace |
LnFt |
$0.50 |
50% |
10 |
- |
| 612 |
Tree /Shrub Establishment |
Acre |
$67.50 |
50% |
10 |
- |
| 614-H |
Water Tank-High |
Each |
$325 |
50% |
10 |
- |
| 614-L |
Water Tank-Low |
Each |
$150 |
50% |
10 |
- |
| 620 |
Underground Outlet |
LnFt |
$3.25 |
50% |
0 |
|
| 633-L |
Waste Utilization-Liquids |
KCuFt/Yr |
$92 |
Incentive |
15 |
1 |
| 633-S |
Waste Utilization-Solid Waste |
Tons/Yr |
$6.25 |
Incentive |
15 |
1 |
| 634 |
Manure Transfer System |
Each |
$0 |
NA |
15 |
1 |
| 634-1 |
Manure Transfer-4"Pipe |
LnFt |
$5 |
50% |
0 |
- |
| 634-2 |
Manure Transfer-6"Pipe |
LnFt |
$9 |
50% |
0 |
- |
| 634-3 |
Manure Transfer-8"Pipe |
LnFt |
$12 |
50% |
0 |
- |
| 634-4 |
Manure Transfer-Pump + Accessories |
Each |
$5,000 |
50% |
0 |
- |
| 638 |
Water/Sediment Control Basin |
CuYd |
$3 |
50% |
15 |
- |
| 642 |
Well |
Each |
$9,000 |
50% |
10 |
- |
| 645 |
Wildlife Upland Habitat |
Acre |
$250 |
50% |
15 |
- |
| 647 |
Early Secessional Habitat Mgt |
Acre |
$30 |
50% |
15 |
- |
| 655 |
Forest Trails and Landings (Waterbars) |
Each |
$21 |
50% |
15 |
- |