Cheraw Fish Hatchery Project
Completed project
 |
NRCS in South Carolina provided design and
construction inspection to the South Carolina Department
of Natural Resources for nine new ponds at the Cheraw
Fish Hatchery between 1996 and 1997. The new ponds were
the first major additions to the fish hatchery since it
was built by the Civilian Conservation Corps (CCC's) in
the 1930's. |
During Construction
 |
Each pond includes a concrete "kettle" at
the lower end to trap the young fish as the water level
is slowly drawn down. A kettle is shown here still in the
forms in a 1997 construction photograph. |
| | |